United States station directory

Production Resource Group Station Details

Production Resource Group is an EV charging station in New Windsor, New York (NY). The listing marks this location as public and open. This listing includes J1772 connector details, 7 reported EV charging ports, and a maximum reported power of 7.2 kW. It was last confirmed on October 11, 2022, but drivers should still check access, hours, pricing, and connector compatibility before visiting.

Quick answer: Production Resource Group is an EV charging station in New Windsor, NY. It is marked public and open in the station data, with address, access hours, phone, status, and last-confirmed details shown when available.
EV ChargingFuel
PublicAccess
OpenStatus
AMPUPEV network
J1772Connectors
7 Level 2Charger details
Office buildingLocation type
7Reported EV ports
7.2 kWMax reported power
New WindsorCity
NYState
12553ZIP

Station details

Station nameProduction Resource Group
Fuel typeEV Charging
Address539 Temple Hill Rd, New Windsor, NY, 12553
CityNew Windsor
StateNew York (NY)
ZIP code12553
AccessPublic
StatusOpen
Phone+1‑833‑692‑6787
HoursContact station for hours of availability.
Date last confirmed2022-10-11
Last updated2023-02-14T15:54:11Z
EV networkAMPUP
Connector typesJ1772
Charger details7 Level 2
PricingPricing not reported
Workplace chargingNo workplace charging reported

Before you visit

Use these source-listed details to plan a visit to Production Resource Group. Call the station or check the network app when access, payment, or hours are important for your trip.

Public accessPublic
Current statusOpen
Access hoursContact station for hours of availability.
Phone+1‑833‑692‑6787
Payment cardsAmerican Express, Android Pay, Apple Pay, Credit card, Discover, Mastercard
Access detailsCredit Card Always
Access groupPublic Credit Card At All Times
Restricted accessNo restriction reported

Data freshness

This record has an older confirmation date, so verify hours, access, and availability before making a trip.

Freshness labelVerify before visiting
Date last confirmed2022-10-11
Last source update2023-02-14
Source station ID230189

Location context

These extra details help identify the station setting, parking area, or on-site access notes when the source provides them.

Location typeOffice building
Owner typePrivately owned
Maximum vehicle classPassenger vehicles (class 1-2)

EV charging equipment

The station data shows Production Resource Group with 7 reported EV charging ports, connector details for 7 J1772, a highest reported power of 7.2 kW.

Charging levelConnectorReported portsMax reported powerNetwork
Level 2J177277.2 kWAMPUP

The highest reported charging power at this station is 7.2 kW. Actual charging speed depends on the vehicle, battery state, charger condition, temperature, and network rules.

Equipment details are based on station equipment data and may differ from on-site availability.

EV pricing and charging notes

EV charging pricing is not reported for this station. Check the network app or on-site payment screen before starting a session.

Pricing statusPricing not reported
Source pricing textPricing not reported

Map and directions

Station coordinates

41.481698, -74.069867

Open map directions

Nearest EV charging stations

The nearby stations below are calculated from the latitude and longitude listed for Production Resource Group. Distances are approximate straight-line distances, not driving distance or travel time.

Related station pages

Frequently asked questions

Where is Production Resource Group located?

Production Resource Group is listed in New Windsor, NY. The address is 539 Temple Hill Rd, New Windsor, NY, 12553.

What EV connectors are available at Production Resource Group?

J1772

Is Production Resource Group open to the public?

The station access is listed as Public, and its status is Open.

What are the access hours for Production Resource Group?

Contact station for hours of availability.