United States station directory

KG FORD CHEY POWER LINK 1 Station Details

KG FORD CHEY POWER LINK 1 is an EV charging station in Cheyenne, Wyoming (WY). The listing marks this location as public and open. This listing includes CCS connector details, 2 reported EV charging ports, and a maximum reported power of 120 kW. It was last confirmed on July 7, 2026, but drivers should still check access, hours, pricing, and connector compatibility before visiting.

Quick answer: KG FORD CHEY POWER LINK 1 is an EV charging station in Cheyenne, WY. It is marked public and open in the station data, with address, access hours, phone, status, and last-confirmed details shown when available.
EV ChargingFuel
PublicAccess
OpenStatus
ChargePoint NetworkEV network
CCSConnectors
2 DC fastCharger details
2Reported EV ports
120 kWMax reported power
CheyenneCity
WYState
82001ZIP
2026-07-07Last confirmed

Station details

Station nameKG FORD CHEY POWER LINK 1
Fuel typeEV Charging
Address2200 Westland Road, Cheyenne, WY, 82001
CityCheyenne
StateWyoming (WY)
ZIP code82001
AccessPublic
StatusOpen
Phone+1‑888‑758‑4389
Hours24 hours daily
Date last confirmed2026-07-07
Last updated2026-07-07T04:18:40Z
EV networkChargePoint Network
Connector typesCCS
Charger details2 DC fast
PricingPricing not reported
Workplace chargingNo workplace charging reported

Before you visit

Use these source-listed details to plan a visit to KG FORD CHEY POWER LINK 1. Call the station or check the network app when access, payment, or hours are important for your trip.

Public accessPublic
Current statusOpen
Access hours24 hours daily
Phone+1‑888‑758‑4389
Payment cardsPayment card details not reported
Access groupPublic
Restricted accessNo restriction reported

Data freshness

Station details can still change, so check the operator or network app before relying on the listing.

Freshness labelRecently confirmed
Date last confirmed2026-07-07
Last source update2026-07-07
Source station ID422457

Location context

These extra details help identify the station setting, parking area, or on-site access notes when the source provides them.

Parking or location notesside lot

EV charging equipment

The station data shows KG FORD CHEY POWER LINK 1 with 2 reported EV charging ports, connector details for 2 CCS, a highest reported power of 120 kW.

Charging levelConnectorReported portsMax reported powerNetwork
DC fastCCS2120 kWChargePoint Network

The highest reported charging power at this station is 120 kW. Actual charging speed depends on the vehicle, battery state, charger condition, temperature, and network rules.

Equipment details are based on station equipment data and may differ from on-site availability.

EV pricing and charging notes

EV charging pricing is not reported for this station. Check the network app or on-site payment screen before starting a session.

Pricing statusPricing not reported
Source pricing textPricing not reported

Map and directions

Station coordinates

41.131375, -104.839794

Open map directions

Nearest EV charging stations

The nearby stations below are calculated from the latitude and longitude listed for KG FORD CHEY POWER LINK 1. Distances are approximate straight-line distances, not driving distance or travel time.

Related station pages

Frequently asked questions

Where is KG FORD CHEY POWER LINK 1 located?

KG FORD CHEY POWER LINK 1 is listed in Cheyenne, WY. The address is 2200 Westland Road, Cheyenne, WY, 82001.

What EV connectors are available at KG FORD CHEY POWER LINK 1?

CCS

Is KG FORD CHEY POWER LINK 1 open to the public?

The station access is listed as Public, and its status is Open.

What are the access hours for KG FORD CHEY POWER LINK 1?

24 hours daily