United States station directory

Green Mountain Power - Williston Hannaford Station Details

Green Mountain Power - Williston Hannaford is an EV charging station in Williston, Vermont (VT). The listing marks this location as public and open. This listing includes CHAdeMO and CCS connector details, 1 reported EV charging ports, and a maximum reported power of 100 kW. It was last confirmed on July 7, 2026, but drivers should still check access, hours, pricing, and connector compatibility before visiting.

Quick answer: Green Mountain Power - Williston Hannaford is an EV charging station in Williston, VT. It is marked public and open in the station data, with address, access hours, phone, status, and last-confirmed details shown when available.
EV ChargingFuel
PublicAccess
OpenStatus
FLOEV network
CHAdeMO, CCSConnectors
1 DC fastCharger details
1Reported EV ports
100 kWMax reported power
WillistonCity
VTState
05495ZIP
2026-07-07Last confirmed

Station details

Station nameGreen Mountain Power - Williston Hannaford
Fuel typeEV Charging
Address78 Marshall Ave, Williston, VT, 05495
CityWilliston
StateVermont (VT)
ZIP code05495
AccessPublic
StatusOpen
Phone+1‑888‑356‑8911
Hours24 hours daily
Date last confirmed2026-07-07
Last updated2026-07-07T05:41:10Z
EV networkFLO
Connector typesCHAdeMO, CCS
Charger details1 DC fast
PricingPricing not reported
Workplace chargingNo workplace charging reported

Before you visit

Use these source-listed details to plan a visit to Green Mountain Power - Williston Hannaford. Call the station or check the network app when access, payment, or hours are important for your trip.

Public accessPublic
Current statusOpen
Access hours24 hours daily
Phone+1‑888‑356‑8911
Payment cardsPayment card details not reported
Access groupPublic
Restricted accessNo restriction reported

Data freshness

Station details can still change, so check the operator or network app before relying on the listing.

Freshness labelRecently confirmed
Date last confirmed2026-07-07
Last source update2026-07-07
Source station ID356161

Location context

These extra details help identify the station setting, parking area, or on-site access notes when the source provides them.

Location typeNot reported
Parking or location notesThe source does not report extra location notes for this station. Use the address, map link, and operator details to confirm access before visiting.

EV charging equipment

The station data shows Green Mountain Power - Williston Hannaford with 1 reported EV charging port, connector details for 1 CCS, 1 CHAdeMO, a highest reported power of 100 kW.

Charging levelConnectorReported portsMax reported powerNetwork
DC fastCCS1100 kWFLO
DC fastCHAdeMO1100 kWFLO

The highest reported charging power at this station is 100 kW. Actual charging speed depends on the vehicle, battery state, charger condition, temperature, and network rules.

Equipment details are based on station equipment data and may differ from on-site availability.

EV pricing and charging notes

EV charging pricing is not reported for this station. Check the network app or on-site payment screen before starting a session.

Pricing statusPricing not reported
Source pricing textPricing not reported

Map and directions

Station coordinates

44.445279, -73.114571

Open map directions

Nearest EV charging stations

The nearby stations below are calculated from the latitude and longitude listed for Green Mountain Power - Williston Hannaford. Distances are approximate straight-line distances, not driving distance or travel time.

Related station pages

Frequently asked questions

Where is Green Mountain Power - Williston Hannaford located?

Green Mountain Power - Williston Hannaford is listed in Williston, VT. The address is 78 Marshall Ave, Williston, VT, 05495.

What EV connectors are available at Green Mountain Power - Williston Hannaford?

CHAdeMO, CCS

Is Green Mountain Power - Williston Hannaford open to the public?

The station access is listed as Public, and its status is Open.

What are the access hours for Green Mountain Power - Williston Hannaford?

24 hours daily