United States station directory
EVsmart - BGE - Carroll County Commissioners Station Details
EVsmart - BGE - Carroll County Commissioners is an EV charging station in Westminster, Maryland (MD). The listing marks this location as public and open. This listing includes CHAdeMO, J1772, and CCS connector details, 4 reported EV charging ports, and a maximum reported power of 150 kW. It was last confirmed on January 13, 2026, but drivers should still check access, hours, pricing, and connector compatibility before visiting.
Station details
| Station name | EVsmart - BGE - Carroll County Commissioners |
|---|---|
| Fuel type | EV Charging |
| Address | 225 N Center St, Westminster, MD, 21157 |
| City | Westminster |
| State | Maryland (MD) |
| ZIP code | 21157 |
| Access | Public |
| Status | Open |
| Phone | +1‑844‑798‑2438 |
| Hours | 24 hours daily |
| Date last confirmed | 2026-01-13 |
| Last updated | 2026-02-02T23:16:24Z |
| EV network | SWTCH |
| Connector types | CHAdeMO, J1772, CCS |
| Charger details | 2 DC fast, 2 Level 2 |
| Pricing | Free |
| Workplace charging | No workplace charging reported |
Before you visit
Use these source-listed details to plan a visit to EVsmart - BGE - Carroll County Commissioners. Call the station or check the network app when access, payment, or hours are important for your trip.
| Public access | Public |
|---|---|
| Current status | Open |
| Access hours | 24 hours daily |
| Phone | +1‑844‑798‑2438 |
| Payment cards | American Express, Discover, Debit card, Mastercard, Visa |
| Access details | Credit Card Always |
| Access group | Public Credit Card At All Times |
| Restricted access | No restriction reported |
Data freshness
Station details can still change, so check the operator or network app before relying on the listing.
| Freshness label | Recently confirmed |
|---|---|
| Date last confirmed | 2026-01-13 |
| Last source update | 2026-02-02 |
| Source station ID | 149892 |
Location context
These extra details help identify the station setting, parking area, or on-site access notes when the source provides them.
| Location type | Municipal government site |
|---|---|
| Owner type | Privately owned |
| Maximum vehicle class | Passenger vehicles (class 1-2) |
EV charging equipment
The station data shows EVsmart - BGE - Carroll County Commissioners with 4 reported EV charging ports, connector details for 1 CCS, 1 CHAdeMO, 2 J1772, a highest reported power of 150 kW.
| Charging level | Connector | Reported ports | Max reported power | Network |
|---|---|---|---|---|
| DC fast | CCS | 1 | 150 kW | SWTCH |
| DC fast | CHAdeMO | 1 | 150 kW | SWTCH |
| Level 2 | J1772 | 2 | 7.2 kW | SWTCH |
The highest reported charging power at this station is 150 kW. Actual charging speed depends on the vehicle, battery state, charger condition, temperature, and network rules.
Equipment details are based on station equipment data and may differ from on-site availability.
EV pricing and charging notes
The station data lists free or no-cost charging, but parking, access, or network rules may still apply.
| Pricing status | Free charging reported |
|---|---|
| Source pricing text | Free |
Map and directions
39.572903, -76.9873623
Nearest EV charging stations
The nearby stations below are calculated from the latitude and longitude listed for EVsmart - BGE - Carroll County Commissioners. Distances are approximate straight-line distances, not driving distance or travel time.
Related station pages
Frequently asked questions
Where is EVsmart - BGE - Carroll County Commissioners located?
EVsmart - BGE - Carroll County Commissioners is listed in Westminster, MD. The address is 225 N Center St, Westminster, MD, 21157.
What EV connectors are available at EVsmart - BGE - Carroll County Commissioners?
CHAdeMO, J1772, CCS
Is EVsmart - BGE - Carroll County Commissioners open to the public?
The station access is listed as Public, and its status is Open.
What are the access hours for EVsmart - BGE - Carroll County Commissioners?
24 hours daily