United States station directory
COYNE ENERGY N SHORE PARK 2 Station Details
COYNE ENERGY N SHORE PARK 2 is an EV charging station in Tawas City, Michigan (MI). The listing marks this location as public and open. This listing includes CHAdeMO and CCS connector details, 1 reported EV charging ports, and a maximum reported power of 125 kW. It was last confirmed on July 7, 2026, but drivers should still check access, hours, pricing, and connector compatibility before visiting.
Station details
| Station name | COYNE ENERGY N SHORE PARK 2 |
|---|---|
| Fuel type | EV Charging |
| Address | 501 W Lake St, Tawas City, MI, 48763 |
| City | Tawas City |
| State | Michigan (MI) |
| ZIP code | 48763 |
| Access | Public |
| Status | Open |
| Phone | +1‑888‑758‑4389 |
| Hours | 24 hours daily |
| Date last confirmed | 2026-07-07 |
| Last updated | 2026-07-07T02:52:25Z |
| EV network | ChargePoint Network |
| Connector types | CHAdeMO, CCS |
| Charger details | 1 DC fast |
| Pricing | Pricing not reported |
| Workplace charging | No workplace charging reported |
Before you visit
Use these source-listed details to plan a visit to COYNE ENERGY N SHORE PARK 2. Call the station or check the network app when access, payment, or hours are important for your trip.
| Public access | Public |
|---|---|
| Current status | Open |
| Access hours | 24 hours daily |
| Phone | +1‑888‑758‑4389 |
| Payment cards | Payment card details not reported |
| Access group | Public |
| Restricted access | No restriction reported |
Data freshness
Station details can still change, so check the operator or network app before relying on the listing.
| Freshness label | Recently confirmed |
|---|---|
| Date last confirmed | 2026-07-07 |
| Last source update | 2026-07-07 |
| Source station ID | 205761 |
Location context
These extra details help identify the station setting, parking area, or on-site access notes when the source provides them.
| Parking or location notes | South side or parking lot |
|---|
EV charging equipment
The station data shows COYNE ENERGY N SHORE PARK 2 with 1 reported EV charging port, connector details for 1 CCS, 1 CHAdeMO, a highest reported power of 125 kW.
| Charging level | Connector | Reported ports | Max reported power | Network |
|---|---|---|---|---|
| DC fast | CCS | 1 | 125 kW | ChargePoint Network |
| DC fast | CHAdeMO | 1 | 125 kW | ChargePoint Network |
The highest reported charging power at this station is 125 kW. Actual charging speed depends on the vehicle, battery state, charger condition, temperature, and network rules.
Equipment details are based on station equipment data and may differ from on-site availability.
EV pricing and charging notes
EV charging pricing is not reported for this station. Check the network app or on-site payment screen before starting a session.
| Pricing status | Pricing not reported |
|---|---|
| Source pricing text | Pricing not reported |
Map and directions
44.267054, -83.518197
Nearest EV charging stations
The nearby stations below are calculated from the latitude and longitude listed for COYNE ENERGY N SHORE PARK 2. Distances are approximate straight-line distances, not driving distance or travel time.
Related station pages
Frequently asked questions
Where is COYNE ENERGY N SHORE PARK 2 located?
COYNE ENERGY N SHORE PARK 2 is listed in Tawas City, MI. The address is 501 W Lake St, Tawas City, MI, 48763.
What EV connectors are available at COYNE ENERGY N SHORE PARK 2?
CHAdeMO, CCS
Is COYNE ENERGY N SHORE PARK 2 open to the public?
The station access is listed as Public, and its status is Open.
What are the access hours for COYNE ENERGY N SHORE PARK 2?
24 hours daily