United States station directory

CBBEL Office Phase 2 Station Details

CBBEL Office Phase 2 is an EV charging station in Rosemont, Illinois (IL). The listing marks this location as public and open. This listing includes J1772 connector details, 16 reported EV charging ports, and a maximum reported power of 9.6 kW. It was last confirmed on January 13, 2025, but drivers should still check access, hours, pricing, and connector compatibility before visiting.

Quick answer: CBBEL Office Phase 2 is an EV charging station in Rosemont, IL. It is marked public and open in the station data, with address, access hours, phone, status, and last-confirmed details shown when available.
EV ChargingFuel
PublicAccess
OpenStatus
EVMATCHEV network
J1772Connectors
16 Level 2Charger details
Office buildingLocation type
16Reported EV ports
9.6 kWMax reported power
ReportedWorkplace charging
RosemontCity
ILState

Station details

Station nameCBBEL Office Phase 2
Fuel typeEV Charging
Address9575 W Higgins Rd Ste 600, Rosemont, IL, 60018
CityRosemont
StateIllinois (IL)
ZIP code60018
AccessPublic
StatusOpen
Phone+1‑619‑631‑8536
Hours24 hours daily
Date last confirmed2025-01-13
Last updated2025-12-22T19:40:02Z
EV networkEVMATCH
Connector typesJ1772
Charger details16 Level 2
Pricing$0.20 per kWh
Workplace chargingYes, workplace charging reported

Before you visit

Use these source-listed details to plan a visit to CBBEL Office Phase 2. Call the station or check the network app when access, payment, or hours are important for your trip.

Public accessPublic
Current statusOpen
Access hours24 hours daily
Phone+1‑619‑631‑8536
Payment cardsAmerican Express, Account balance, Credit card, Discover, Debit card, Mastercard, Visa
Access groupPublic
Restricted accessNo restriction reported
Workplace chargingYes, workplace charging is reported

Data freshness

Station details can still change, so check the operator or network app before relying on the listing.

Freshness labelOlder confirmation
Date last confirmed2025-01-13
Last source update2025-12-22
Source station ID375179

Location context

These extra details help identify the station setting, parking area, or on-site access notes when the source provides them.

Location typeOffice building
Owner typePrivately owned
Maximum vehicle classPassenger vehicles (class 1-2)

EV charging equipment

The station data shows CBBEL Office Phase 2 with 16 reported EV charging ports, connector details for 16 J1772, a highest reported power of 9.6 kW.

Charging levelConnectorReported portsMax reported powerNetwork
Level 2J1772169.6 kWEVMATCH

The highest reported charging power at this station is 9.6 kW. Actual charging speed depends on the vehicle, battery state, charger condition, temperature, and network rules.

Equipment details are based on station equipment data and may differ from on-site availability.

EV pricing and charging notes

Pricing details are reported for this station. Confirm current rates in the charging network app because pricing can change.

Pricing statusPricing details reported
Source pricing text$0.20 per kWh

Map and directions

Station coordinates

41.9927923, -87.86505387

Open map directions

Nearest EV charging stations

The nearby stations below are calculated from the latitude and longitude listed for CBBEL Office Phase 2. Distances are approximate straight-line distances, not driving distance or travel time.

Related station pages

Frequently asked questions

Where is CBBEL Office Phase 2 located?

CBBEL Office Phase 2 is listed in Rosemont, IL. The address is 9575 W Higgins Rd Ste 600, Rosemont, IL, 60018.

What EV connectors are available at CBBEL Office Phase 2?

J1772

Is CBBEL Office Phase 2 open to the public?

The station access is listed as Public, and its status is Open.

What are the access hours for CBBEL Office Phase 2?

24 hours daily