United States station directory
ChargePoint Network Charging Stations in Pleasant Grove, UT
Browse public ChargePoint Network EV charging locations in Pleasant Grove, Utah.
6Public, open locations
0DC fast chargers
6Level 2 chargers
424-hour locations
0Free records
J1772Common connector
0Reported EV ports
6.5 kWMax reported power
ChargePoint Network charging-level and access summary in Pleasant Grove
| Metric | station locations |
|---|---|
| Public open station locations | 6 |
| DC fast charging records | 0 |
| Level 2 charging records | 6 |
| Records with both DC fast and Level 2 | 0 |
| Records with reported power kW | 6 |
| Records with pricing text | 0 |
| Free charging reported | 0 |
| 24-hour access reported | 4 |
ChargePoint Network data coverage in Pleasant Grove
| Field | station locations |
|---|---|
| Phone number reported | 6 |
| Access hours reported | 6 |
| Last-confirmed date reported | 6 |
| Facility type reported | 0 |
| Cards accepted reported | 0 |
| Parking/location notes reported | 1 |
ChargePoint Network station list in Pleasant Grove
| Station | Address | Network | Connectors | Charger details | Hours | Last confirmed |
|---|---|---|---|---|---|---|
| SJPI SJPI VG3 # 3 | 1333 Valley Grove Way, Pleasant Grove, UT, 84062 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| SJPI SJPI VG3 # 4 | 1333 Valley Grove Way, Pleasant Grove, UT, 84062 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| SJPI SJPI VG3 #1 | 1333 Valley Grove Way, Pleasant Grove, UT, 84062 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| SJPI SJPI VG3 #2 | 1333 Valley Grove Way, Pleasant Grove, UT, 84062 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| SJPI VGI #2 | 1064 S North County Blvd, Pleasant Grove, UT, 84062 | ChargePoint Network | J1772 | 2 Level 2 | Mon: 7:00am-7:00pm; Tue: 7:00am-7:00pm; Wed: 7:00am-7:00pm; Thu: 7:00am-7:00pm; Fri: 7:00am-7:00pm; Sat: 7:00am-7:00pm; Sun: 7:00am-7:00pm | 2026-07-07 |
| SJPI VGI #3 | 1064 S. North County Blvd, Pleasant Grove, UT, 84062 | ChargePoint Network | J1772 | 2 Level 2 | Mon: 7:00am-7:00pm; Tue: 7:00am-7:00pm; Wed: 7:00am-7:00pm; Thu: 7:00am-7:00pm; Fri: 7:00am-7:00pm; Sat: 7:00am-7:00pm; Sun: 7:00am-7:00pm | 2026-07-07 |
ChargePoint Network connector summary in Pleasant Grove
| Connector | Stations |
|---|---|
| J1772 | 6 |
Related EV charging pages
Frequently asked questions
How many ChargePoint Network charging stations are in Pleasant Grove, UT?
Pleasant Grove, UT has 6 public ChargePoint Network EV charging locations marked open in the station data.
Does this page show ChargePoint Network connector types?
Yes. Connector types are shown when that detail is available.
Should I confirm availability before driving?
Yes. This directory does not guarantee live charger availability, pricing, or access at the time you arrive.