United States station directory
ChargePoint Network Charging Stations in Altoona, IA
Browse public ChargePoint Network EV charging locations in Altoona, Iowa.
13Public, open locations
0DC fast chargers
13Level 2 chargers
1324-hour locations
0Free records
J1772Common connector
0Reported EV ports
6.5 kWMax reported power
ChargePoint Network charging-level and access summary in Altoona
| Metric | station locations |
|---|---|
| Public open station locations | 13 |
| DC fast charging records | 0 |
| Level 2 charging records | 13 |
| Records with both DC fast and Level 2 | 0 |
| Records with reported power kW | 13 |
| Records with pricing text | 0 |
| Free charging reported | 0 |
| 24-hour access reported | 13 |
ChargePoint Network data coverage in Altoona
| Field | station locations |
|---|---|
| Phone number reported | 13 |
| Access hours reported | 13 |
| Last-confirmed date reported | 13 |
| Facility type reported | 0 |
| Cards accepted reported | 0 |
| Parking/location notes reported | 0 |
ChargePoint Network station list in Altoona
| Station | Address | Network | Connectors | Charger details | Hours | Last confirmed |
|---|---|---|---|---|---|---|
| FBSICULUS PCI 12 #1 | 4967-5051 NE 62nd Ave, Altoona, IA, 50009 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| FBSICULUS PCI 12 #2 | 4967-5051 NE 62nd Ave, Altoona, IA, 50009 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| FBSICULUS PCI 12 #3 | 5200 NE 62nd Ave, Altoona, IA, 50009 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| FBSICULUS PCI 12 #4 | 5200 NE 62nd Ave, Altoona, IA, 50009 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| FBSICULUS PCI 3-4 #1 | Share Way NW, Altoona, IA, 50009 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| FBSICULUS PCI 3-4 #2 | Share Way NW, Altoona, IA, 50009 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| FBSICULUS PCI 3-4 #3 | Share Way NW, Altoona, IA, 50009 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| FBSICULUS PCI 56 #1 | 2000 Share Way Northwest, Altoona, IA, 50009 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| FBSICULUS PCI 56 #2 | 2000 Share Way Northwest, Altoona, IA, 50009 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| FBSICULUS PCI 56 #3 | 2000 Share Way Northwest, Altoona, IA, 50009 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| FBSICULUS PEMB #3 | 5501 NE 62nd Ave, Altoona, IA, 50009 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| FBSICULUS PEMB #4 | 5501 NE 62nd Ave, Altoona, IA, 50009 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| FBSICULUS PEMB #5 | 5501 NE 62nd Ave, Altoona, IA, 50009 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
ChargePoint Network connector summary in Altoona
| Connector | Stations |
|---|---|
| J1772 | 13 |
Related EV charging pages
Frequently asked questions
How many ChargePoint Network charging stations are in Altoona, IA?
Altoona, IA has 13 public ChargePoint Network EV charging locations marked open in the station data.
Does this page show ChargePoint Network connector types?
Yes. Connector types are shown when that detail is available.
Should I confirm availability before driving?
Yes. This directory does not guarantee live charger availability, pricing, or access at the time you arrive.