United States station directory
J1772 EV Charging Stations in Burlington, NJ
Browse public EV charging station locations in Burlington, NJ where J1772 connector details are reported.
12station locations
0DC fast chargers
12Level 2 chargers
624-hour locations
1Free records
0Reported EV ports
12 kWMax reported power
NREL/AFDCData source
Local coverage context for Burlington
Census place data gives a simple size reference for this EV charging page. Station density is only a planning signal; actual convenience depends on neighborhoods, highways, parking access, and charger availability.
| Detail | Value |
|---|---|
| Census place | Burlington |
| Land area | 3 square miles |
| Population context | 9,993 people |
| Local station density | 4.0 public listings per square mile |
J1772 network coverage in Burlington
| Network | station locations |
|---|---|
| ChargePoint Network | 11 |
J1772 station locations in Burlington
| Station | Address | Network | Connectors | Charger details | Hours | Last confirmed |
|---|---|---|---|---|---|---|
| BURLINGTON EV EV1-BLD1 | 700 John F Kennedy Way, Burlington, NJ, 08016 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| BURLINGTON EV EV1-BLD4 | 700 John F Kennedy Way, Burlington, NJ, 08016 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| BURLINGTON EV EV2-BLD1 | 700 John F Kennedy Way, Burlington, NJ, 08016 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| BURLINGTON EV EV3-BLD1 | 700 John F Kennedy Way, Burlington, NJ, 08016 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| FRONT SHOWROOM LUCAS FORD PS | 900 US-130, Burlington, NJ, 08016 | ChargePoint Network | J1772 | 2 Level 2 | 24 hours daily | 2026-07-07 |
| FRONT SHOWROOM SHOP ST1 | 900 US-130, Burlington, NJ, 08016 | ChargePoint Network | J1772 | 1 Level 2 | 24 hours daily | 2026-07-07 |
| STACY STREET BARCLAY ST1 | 335 Stacy Street, Burlington, NJ, 08016 | ChargePoint Network | J1772 | 2 Level 2 | Mon: 6:00am-11:59pm; Tue: 6:00am-11:59pm; Wed: 6:00am-11:59pm; Thu: 6:00am-11:59pm; Fri: 6:00am-11:59pm; Sat: 6:00am-11:59pm; Sun: 6:00am-11:59pm | 2026-07-07 |
| STACY STREET STACY ST ST1 | 35 East Broad Street, Burlington, NJ, 08016 | ChargePoint Network | J1772 | 2 Level 2 | Mon: 6:00am-11:59pm; Tue: 6:00am-11:59pm; Wed: 6:00am-11:59pm; Thu: 6:00am-11:59pm; Fri: 6:00am-11:59pm; Sat: 6:00am-11:59pm; Sun: 6:00am-11:59pm | 2026-07-07 |
| STACY STREET STACY ST ST2 | 35 East Broad Street, Burlington, NJ, 08016 | ChargePoint Network | J1772 | 2 Level 2 | Mon: 6:00am-11:59pm; Tue: 6:00am-11:59pm; Wed: 6:00am-11:59pm; Thu: 6:00am-11:59pm; Fri: 6:00am-11:59pm; Sat: 6:00am-11:59pm; Sun: 6:00am-11:59pm | 2026-07-07 |
| STACY STREET STACY ST ST3 | 35 East Broad Street, Burlington, NJ, 08016 | ChargePoint Network | J1772 | 2 Level 2 | Mon: 6:00am-11:59pm; Tue: 6:00am-11:59pm; Wed: 6:00am-11:59pm; Thu: 6:00am-11:59pm; Fri: 6:00am-11:59pm; Sat: 6:00am-11:59pm; Sun: 6:00am-11:59pm | 2026-07-07 |
| STACY STREET STACY ST ST4 | 35 East Broad Street, Burlington, NJ, 08016 | ChargePoint Network | J1772 | 2 Level 2 | Mon: 6:00am-11:59pm; Tue: 6:00am-11:59pm; Wed: 6:00am-11:59pm; Thu: 6:00am-11:59pm; Fri: 6:00am-11:59pm; Sat: 6:00am-11:59pm; Sun: 6:00am-11:59pm | 2026-07-07 |
| The Herman T. Costello Lyceum Hall | 432 High St, Burlington, NJ, 08016 | Non-Networked | J1772 | 2 Level 2 | Building hours | 2024-11-06 |
Related pages
Frequently asked questions
How many J1772 charging stations are in Burlington, NJ?
This page includes 12 public open station records with J1772 connector details in Burlington.
Should I confirm J1772 compatibility before driving?
Yes. Confirm connector compatibility, adapter needs, network access, pricing, and live charger status before starting a trip.
Can stations appear on more than one connector page?
Yes. A station with multiple connector types can appear on each matching connector page.